The port of Cherbourg was critical to sustaining the invasion force and it was always intended to make use of it, especially as it would allow ships sailing directly from the US to offload without intermediate steps in England.

The Allies assumed German forces would both put up a stiff resistance and whilst doing so, create a much damage as possible.

Both assumptions were proven to be correct.

The Germans surrendered the port on D+20, the 26th of June 1944, a week after the great storm.

Leading the restoration of the port was the US Army 1056th Engineer Group and when the conducted their first survey, the damage was considerable.

The German engineers had done about as complete a port denial operation as could have been.

A US Officer described it as;

A masterful job, beyond a doubt the most complete, intensive, and best planned demolition in history

In fact, Hitler awarded a Knights Cross to Rear Admiral Walter Hennecke, the Officer in charge of destroying the port.


[AMAZONPRODUCTS asin=”1472806638″ listprice=”0″]

The Transatlantic Terminal was completely destroyed, the whole area extensively mined, ships scuttled at dock entrances and quaysides and most of the facilities destroyed with copious amounts of HE.

[tabs] [tab title=”Cherbourg Damage 1″]

Cherbourg Port Damage 03[/tab] [tab title=”Cherbourg Damage 2″]

p013157.jpg[/tab] [tab title=”Cherbourg Damage 3″]

Cherbourg Port Damage 04[/tab] [tab title=”Cherbourg Damage 4″]

Cherbourg Port Damage 05[/tab] [tab title=”Cherbourg Damage 5″]

Cherbourg Port Damage 07[/tab] [tab title=”Cherbourg Damage 6″]

Cherbourg Port Damage 08[/tab] [tab title=”Cherbourg Damage 7″]

Cherbourg Port Damage 11[/tab] [tab title=”Cherbourg Damage 8″]

Cherbourg Port Damage 12[/tab] [/tabs]

A plan was formulated!

Scuttled ships were removed, quaysides and other facilities repaired, road and rail links restored and munitions cleared.

The Rhino ferries and LST’s continued their sterling work until the quaysides were repaired.

[tabs] [tab title=”Salvage 1″]

Cherbourg Salvage 1[/tab] [tab title=”Salvage 2″]

Cherbourg Salvage 2[/tab] [tab title=”Salvage 3″]

Cherbourg Salvage 3[/tab] [tab title=”Salvage 4″]

Cherbourg Salvage 5[/tab] [tab title=”Salvage 5″]

Cherbourg Salvage 4[/tab] [tab title=”Salvage 6″]

Cherbourg Salvage 6[/tab] [/tabs]

Although the Germans had made an excellent job of destroying the port they made a rather large error in leaving a significant quantity of steel beams, 1m deep and 22m long. The engineers made extensive use of these to in repairing sea walls and berths.


[adrotate group=”1″]

The first deep draught ship to offload at Cherbourg arrived on the 16th of July but this was by no means anywhere near the full capacity of the port and it would be several months before the port was being used at capacity.

When the 1056th Engineer Group were redeployed from Cherbourg to the Albert Canal area by the 1st of November, Cherbourg was capable of unloading approximately 25,000 tons per day.

By March 1945, the port had been used to land over 2 million tons of stores and equipment.

The rehabilitation of Cherbourg was a magnificent achievement, mostly by the US Army and US Navy, often overshadowed by the efforts on the Normandy beaches.

Table of Contents

Introduction

Designing and Building the Mulberry Harbour

D Day Plus

Fuel

The Rhino Pontoon and DUKW

Cherbourg

Post War

Summary and Final Thoughts


[adrotate group=”1″]

 

Subscribe
Notify of
guest
0 Comments
Inline Feedbacks
View all comments
0
Would love your thoughts, please comment.x
()
x