Warrior Armoured Fighting Vehicle

  • Post comments:26 Comments
  • Reading time:97 mins read
  • Post category:Vehicles

The history of the Warrior Infantry Fighting Vehicle, from its inception to the cancellation of the Capability Sustainment Programme in 2021

The Warrior infantry fighting vehicle is the mainstay of the British Army’s armoured infantry force, a solid and capable vehicle with a long and successful service history. After the Warrior Capability Sustainment programme was cancelled in 2021, the British armoured infantry will rely on non-upgraded Warriors until the out-of-service date, beyond that, options remain unclear.

Warrior infantry fighting vehicle

The British Army describe Warrior as;

The Warrior infantry fighting vehicle has the speed and performance to keep up with Challenger 2 main battle tanks over the most difficult terrain, and the firepower and armour to support infantry in the assault. The Warrior family of seven variants of armoured vehicles, which entered service in 1988, has been highly successful for armoured infantry battlegroups in the Gulf War, Bosnia and Kosovo and Iraq. They provide excellent mobility, lethality and survivability for the infantry and have enabled key elements from the Royal Artillery and Royal Electrical and Mechanical Engineers to operate effectively within the battlegroup

This article will describe the predecessor to Warrior, and its development, deployment, and current status.

Before Warrior – The Armoured Personnel Carrier (APC) Concept

The tracked armoured personnel carrier was a logical development of the British and Canadian Ram-based Kangaroo, ‘Defrocked Priest’ and Landing Vehicle Tracked (LVT) ‘Alligator’ vehicles used in Normandy, Holland and Italy during World War II.

The Post War focus for the British Army was ‘withdrawal from Empire’ and the defence of Western Europe against Warsaw Pact forces. Although the Saracen family of vehicles were highly mobile, they could not keep up with Main Battle Tanks.

Alvis Saracen

The Armoured Personnel Carrier (APC) was developed to allow infantry soldiers to survive in an NBC environment and against artillery fragments. The vehicle would provide sufficient mobility to get the infantry to a point of disembarkation, and no more.

We can reasonably trace the FV432’s roots to a number of post-war vehicle developments such as the Oxford Carrier and FV401 Cambridge Carrier, however, the direct forerunner of the FV432 is the FV420 series of vehicles, developed in the late fifties.

The FV420 vehicle family was to comprise; the FV421 Load Carrier, FV422 Armoured Personnel Carrier, FV423 Command Vehicle, FV424 Royal Engineers Section Vehicle, FV425 Royal Electrical and Mechanical Engineers Section Vehicle and the FV426 Orange William Anti-Tank Guided Weapon Vehicle, although only a small number were built.

Using experience from the FV420, the FV421 Load Carrier was the first of the family. It had an armoured front section with the ability to carry a 3-tonne payload. FV421 was also full amphibious without preparation and could be fitted with ammunition stowage racks, quite innovative for its day.

FV421 Load Carrier
FV421 Load Carrier

The FV430 series was built on lessons from the FV421 and used most of the major components. The first of the series was the FV431 load carrier, an image of the prototype is below.

FV421

Further work continued and in 1962, GKN Sankey was issued a production contract the same year.

Following troop trials, the first production FV432 vehicles entered service in 1963 and by the end of the production run in 1971 over 3,000 vehicles had entered service with the British Army.

FV432

The FV432 is a simple and adaptable vehicle, a basic armoured box of welded steel construction to provide protection against automatic weapons and shell splinters. The FV430 series of vehicles has progressed through several marks and many variants although it was never given a formal name. The original suggestion of the Trojan was dropped after objections from the Trojan car company.

The FV432 would also be used for many tasks and have role-specific equipment, WOMBAT carrier, ground surveillance, command, mortar, ambulance, recovery, Carl Gustav, Barmine layer, Milan, sonic detection, a 30mm RARDEN Fox turret and even provide OPFOR vehicles.

Other variants (over the years) included the FV433 Abbot Self-Propelled Gun, FV434 Carrier Maintenance, FV436 Mortar Locating Radar, FV437 Pathfinder (with snorkel), FV438 Swingfire Launcher and FV439 Communications.

It is still in service in 2022 – some 60-odd years after it was first introduced – and is likely to continue to be so for some time still to come, the joke being it will still be there when everyone else is in laser-powered hover tanks!

FV432

Beyond the APC – Development of the Warrior Mechanised Infantry Combat Vehicle (MICV)

With the Armoured Personnel Carrier (APC) firmly established and in service across NATO, further doctrinal development came to the conclusion that APCs would likely meet enemy APCs on the battlefield, and thoughts moved to how they would survive and defeat them.

Emerging thinking and conceptual development were given fresh impetus after the appearance of the Soviet BMP-1 during Victory Parades in 1967, entering service with the 120th Guards Rogachev Motor Rifle Division a year or so later.

BMP-1

Formal work on the FV432 replacement started the same year.

By the early seventies, work by the Fighting Vehicle Research and Development Establishment (FVRDE) had progressed rapidly. Although differences remained between NATO nations on whether personnel should fight mounted (with firing ports) or dismounted, the size of the basic fighting unit, and others, the Mechanised Infantry Combat Vehicle (MICV) became dominant during this period.

No longer would personnel dismount at stand-off distances and advance to contact on foot, the MICV would allow them to dismount practically on top of their objective, having the firepower and protection to get them there and help infantry personnel win the close battle whilst there.

As is often the case, several designs emerged and were either progressed or eliminated.

Early designs envisaged three weight classes; Light at 14.6 tonnes, Medium at 24.2 tonnes and an up-armoured version of the Medium that weighed 28.9 tonnes. The Light variant would use the same engine as the in-development Combat Engineer Tractor (CET) and a number of other variants would be part of the wider family.

Another design envisaged a single, 30-tonne vehicle, powered by a Rolls Royce CV8-derived engine providing 750bhp of power, a TN-17 transmission system, and protected by the (new at the time) Chobham composite armour.

Chobham armour was a collective name for a range of different composite armour constructions created under Project Burlington, developed over a number of years that would eventually be used on Challenger 1 and 2, and many other vehicles since.

The initial testing during the early seventies confirmed that a Burlington-protected MICV could withstand all known handheld hollow charge weapons, 105mm APDS and HESH.

A number of small development contracts were let and a turretless automotive test rig was produced.

Test vehicle

Different proposals for armament and concept of employment considered a 30mm RARDEN equipped turret for a platoon commander and 7.62mm GPMG for accompanying section vehicles, for example.

Other proposals included a version with General Support Rocket System RS80 (FOIL) that would eventually give way to MLRS in the late seventies and a vehicle with wholly modular armour that could be tailored to the threat environment.

FOIL Rocket

None of these ‘heavy MICV’ concepts progressed as they were considered too expensive to procure in quantity.

Approval was given by the MoD to enter a Project Definition phase for stage 1 (PD1) and was completed by the new Military Vehicles and Engineering Establishment (MVEE) between 1972 and 1976. MVEE also contracted with a number of industry partners as part of PD1 to support their work, with GKN and Vickers Defence Systems selected for competitive studies.

Warrior PD1

The familiar Warrior shape and configuration started to emerge.

The older doctrine foresaw NATO forces retreating gradually in face of Warsaw Pact forces and defeating them by attrition. The overwhelming superiority of opposing forces meant this was increasingly unrealistic and resorting to tactical nuclear responses meant in reality, strategic nuclear exchanges.

The alternative was to take a more aggressive stance and instead of retreating in good order, NATO forces would aggressively manoeuvre to engage those advancing forces at the most advantageous point to inflict maximum damage.

This needed combined arms manoeuvre, infantry vehicles working closely with tanks, artillery and close air support. MICV was designed to keep up with main battle tanks, destroy enemy infantry vehicles and fight forward to dismount their infantry practically on top of enemy positions. MICV would then withdraw and provide fire support.

The result of the concept, test and study work completed between 1971 and 1976 was the General Staff Requirement (GSR) 3533, to be fulfilled by the MICV4A design, and subsequently, the Mechanised Infantry Combat Vehicle for the Eighties, or MICV-80.

(GSR) 3533 specified the carriage of 10 personnel (including driver and gunner), the ability to keep up with the Challenger 1 Main Battle Tank, protection against shell fragments, automatic weapons fire and sufficient firepower to counter enemy MICVs and dismounted infantry.

The MCV-80 (Mechanised Combat Vehicle for the eighties) was finally selected on the basis of a study that compared the GKN design with the US XM2 vehicle that would go on to become the M2 Bradley Fighting Vehicle.

A competition for the development phase was announced that would take forward the chosen MICV4A concept. Manufacturing contracts would be let separately from development, this was the first time such an arrangement had been proposed.

GKN Sankey won the development contract in 1977, largely due to the technical prowess of the Sankey chief designer, Ken Lofts. It was an important win for GKN as the prevailing thinking was that the winner of the development contract would be in pole position for the separate manufacturing contract as well, at that time thought to be for in excess of 1,000 vehicles.

GKN MCV-80 Model
GKN MCV-80 Model

In response to a Parliamentary written question, the government provided an update to the House of Commons on the progress in replacing the FV-432.

The Army’s present armoured personnel carrier, the FV432 series of vehicles, has been in service since the 1960s and will need to be replaced from the mid-1980s. Two vehicles have been considered for this requirement, the mechanised combat vehicle (MCV-80) designed by the British firm GKN-Sankey, and the American infantry fighting vehicle, which would be manufactured under licence in this country. After a careful assessment of the relevant operational, financial and industrial factors I have decided to select MCV 80 to meet this requirement. The total estimated cost of the replacement programme is about £1,000 million and full development will be launched shortly.

This initial contract covered ‘Project Definition Phase 2’ which also included the production of the first batch of vehicles. GKN Sankey was awarded the main development contract in 1980. By this point, GKN had already completed one static and two mobile test rigs as part of earlier work, and the first prototype was built by the end of 1980.

MCV-80 Prototype (note lifting eyes)
MCV-80 Prototype (note lifting eyes)

Alec Daly joined GKN in 1978 to head up the Sankey division after 16 years at Ford. The new broom certainly swept clean and after the highs of the development contract award had subsided, he made it clear that should it not meet time and cost objectives, there would be little chance of the production contract going to GKN, and it was the production contract that he wanted.

Despite success with AT-104, MCV-80 was in a different league and the lack of business and project management at GKN seriously worried him.

To this end, he formed a partnership with the chief designer, Ken Lofts, introducing practices that were becoming more common in the automotive industry but were still rare elsewhere. One of these – at the time revolutionary – concepts was to ask the user what they wanted and what they thought was important.

We went to the soldiers and asked what they wanted most from the vehicle. They picked out two things; one, they didn’t want a mine to be able blow it up when the vehicle went over it; and two, they wanted it to start every time you pressed the button

Alec Daly

The end of the development phase was completed on time and on budget.

This vindicated GKN but more importantly, Michael Heseltine, who had insisted on splitting the development and manufacturing contract, allowing a single prime contractor to be wholly responsible for the design and development phase, making this subject to competition and culling the Cost Plus Contract model.

Warrior certainly had a whiff of an industrial revolution about it.

MCV-80 Prototype
MCV-80 Prototype

As the MCV-80 project progressed into manufacture a separate study was started to examine the wider requirement for armoured vehicles, called Armoured Fighting Vehicles (AFVs) for the Eighties. The first stage looked at medium-weight vehicles. Stage 2, main battle tanks, and stage 3, a self-propelled anti-tank gun (SPAT) with an air-portable variant called ASPAT.

All the concepts except ASPAT used an evolved MCV-80 design with greater protection, weighing 43 tonnes, ironically, about the same weight as the latest Warrior and Scout variants. ASPAT was to reuse CVR(T) components and weigh 12 tonnes, the same approximate weight as the latest CVR(T) Mark 2 vehicles.

GKN also proposed a shorter and lower variant of Warrior to be used in the reconnaissance role called LOVATT (more on this below), shades of FRES, SV Scout and Ajax perhaps.

The first MICV-80 prototypes had twin doors but this was subsequently changed.

MCV-80 prototype with double rear doors and plate lifting eyes
MCV-80 prototype with double rear doors and plate lifting eyes

GKN produced 14 prototypes, many of which were ultimately destroyed (in mine tests, for example) but some would be retained for training, trials and development purposes. One of the Mobile Test Rigs was deployed to Germany for Exercise Lionheart in 1984.

Work continued throughout 1984 as preparation for the manufacturing contract progressed.

With development complete, GKN, Vickers Defence Systems, Royal Ordnance and Alvis participated in the production contract. Instead of caving in to pressure to reduce the cost per vehicle GKN stuck to their original bid price, emphasising quality.

It would prove to be a winning strategy, it exceeded reliability targets and GKN won the £1 billion contract in 1984 and MCV-80 became Warrior.

Production started at a newly built GKN factory in Telford in 1986, and early production vehicles are shown below.

The original order was for 280 vehicles with a balance of 1,053 following completion. It was hoped that a 1,800-strong fleet would eventually completely replace FV432 in the nine 9 newly formed Armoured Infantry Battalions, but the costs meant the FV432 would have to continue on in secondary roles.

GKN indicated that the cost proportion of the major components of the Warrior section vehicle was;

  • Turret: 33%
  • Powerpack: 23%
  • Sights: 7%
  • Dampers: 5%
  • Track: 3%
  • Final Drive and Roadwheels: 3%
  • NBC Pack: 2%
  • Hull and miscellaneous items: 24%

An Armoured Infantry Battalion would, therefore, comprise 3 distinct families of armoured vehicles: CVR(T), Warrior and FV432 plus the various odds and sods of B Vehicles like trucks and Land Rovers.

The first unit to receive Warrior was the 1st Battalion Grenadier Guards in Germany, followed by the 1st Battalion of the Staffordshire Regiment between 1987 and 1988.

Warrior Technical Details And In-Service Variants

Like CVR(T), Warrior is a family of vehicles built with a common hull and automotive components.

Rolls Royce Motors formed a new company with Self Changing Gears called Trackpower Transmissions to develop a new powerpack for MCV-80.

A Warrior powerpack consists of a 550hp Rolls Royce/Perkins CV-8TCA Condor diesel engine and a General Motors X-300-4B automatic transmission. The same engine, albeit in 12-cylinder format, was used for the Challenger and the Scammell Commander tank transporter, a rather intelligent piece of commonality that seems to elude us these days.

Warrior power pack

Hull armour is welded aluminium, designed to provide protection against 155mm shell splinters, 14.5mm armour piercing rounds and 9kg anti-tank mines. Torsion bar suspension and aluminium road wheels enable a cross-country speed of 35kph.

Other mobility characteristics include a ground clearance of 0.48m, 1.3m fording depth, 2.5m trench crossing distance, a maximum vertical obstacle height of 0.75m, a maximum gradient of 60% and a side slope of 40%. The 82 link tracks are 0.48m wide and maintain a contact length of 3.82m for those interested in ground pressure per square metre.

Although the prototype had two fuel tanks in side-mounted external panniers the production models use a translucent polyethene fuel tank underneath the turret that delivers a range of approximately 600km. During the Gulf War, it was reported that the movement of fuel in the tank induced motion sickness so it is often painted.

The basic infantry section vehicle is 6.3m long, 3m wide, 2.8m high, and with a combat weight of 28 tonnes. This combat weight has, of course, increased with those still in service. Fuel capacity is 772 litres which provides a maximum range of 660km.

A number of variants came into service with the British Army and GKN developed and proposed a number of others.

FV510 Infantry Section Vehicle (492 produced)

The most common variant is used to transport an infantry section, and defeat enemy APCs and positions.

Warrior

Housed in a Vickers Defence developed 2-man welded steel turret is an unstabilised 30mm RARDEN cannon and McDonnell Douglas EX-34 chain gun, designated L94A1.

Traverse is powered, but the elevation is manual, 360 degrees traverse and +45 degree -15 degree elevation, storing 200 rounds for the RARDEN and 2,000 for the chain gun. The turret also mounts a pair of smoke grenade launchers.

RARDEN

Distinguished from the other turreted variants by its single-powered door, the infantry section vehicle carries 7 infantry soldiers in addition to the 3 crew (commander, gunner and driver).

The Pilkington Optronics RAVEN combined Day/Night sight provided the gunner and commander with a 24-hour capability for surveillance, fall of shot, target acquisition and firing the cannon and machine gun.

Pilkington RAVEN

Total orders for the FV510 numbered 384 plus an additional 108 placed after the Gulf War. These 108 were to be equipped with the TRIGAT anti-tank missile but were fitted with Milan in the interim. There were 3 replacement vehicles for those that were destroyed, leaving a final total of 492.

These main variants came into service between 1988 and 1990.

FV510

FV511 Infantry Command Vehicle (84 produced)

Double rear doors, four externally mounted antennae and a rear compartment full of map boards and various radios distinguish the 84 FV511 Infantry Command Vehicles from their siblings.

FV511

The radio fit differs depending on whether the vehicle is intended for the Platoon, Company or Battalion command role.

Other than those changes, the FV511 is designed to look just like the FV510.

FV512 Mechanised Combat Repair Vehicle (105 produced)

The 107 FV513 Mechanised Recovery Vehicle (Repair)can tow the T4 High Mobility Trailer which is used to carry two complete Warrior power packs (or one for a Challenger for that matter).

FV512

The FV512 is used by the REME Light Aid Detachment supporting the Armoured Infantry Battalion. The FV512’s hydraulic jib can lift 6.5 tonnes at 4.5m outreach, with a 360-degree traverse.

FV512

The vehicle carries 2 crew and 3 fitters.

FV513 Mechanised Recovery Vehicle (Repair) (39 produced)

The 39 FV513 vehicles are similar to the FV512 but have a large earth anchor and winch.

FV513

The hydraulically operated winch has a straight pull capacity of 20 tonnes, and 38 tonnes when double-reeved. A suspension lockout facilitates winching and it has a 200m rope length.

Both FV513 Mechanised Recovery Vehicle (Repair) and FV512 Mechanised Combat Repair Vehicle have a small commanders cupola instead of a manned turret.

FV514 Mechanised Artillery Observation Vehicle (52 produced)

The 52 MAOVs were to be used by Royal Artillery and Royal Horse Artillery forward observation teams. Intentionally designed to look like the more numerous Infantry Fighting Vehicle, the MAOV contains a collection of electronic fire control and communications equipment.

FV514

Whilst the assistant observer has the same RAVEN combined day/night sight as found on the Section vehicle, the lead observer has the more sophisticated OSPREY, also from Pilkington Optronics.

Pilkington OSPREY

In addition to improved thermal imaging and day/night optics, they were also fitted with the Thorn-Emi J Band Pulse-Doppler Man-Portable Surveillance and Target Acquisition Radar (MSTAR), Battlefield Artillery Target Engagement System (BATES), and a navigation and attitude reference system called the Azimuth Positioning Elevation System (APES).

The MSTAR radar could be dismounted and used remotely from the vehicle.

MSTAR

FV514 also has a dummy RARDEN cannon.

FV515 Battery Command Vehicle (19 produced)

The 19 FV515 Battery Command Vehicles were the final Warrior variant, providing AS90 battery commanders with armoured mobility.

FV515

Like the Artillery Observation Vehicle, it has a dummy RARDEN cannon.

Ambulance

Although not a formal variant, a number of Battery Command Vehicles were converted to ambulances for use in Afghanistan.

Warrior ambulance
Warrior ambulance

Other Warrior Variants And Concepts

Warrior was an adaptable base vehicle and in the years following its entry into service, there would be many proposed variants, different turrets and incremental improvement projects, as ownership moved from GKN to Alvis Vickers and finally, BAE.

These are not in strict chronological order and overlap with the operations section later in this article, many are just concept drawings or models.

Desert and Arctic Warrior

Even before some of the in-service variants were even designed, GKN had an eye on the Middle East market and produced a variant that would later go on to become Desert Warrior.

This first iteration had the standard Vickers RARDEN turret but included firing ports for the crew.

Desert Warrior

After a sales campaign, 245 were ordered by Kuwait in 1993, with the final vehicles manufactured in 1997, the last time any new Warriors were built. Unlike the image above, the Kuwaiti Desert Warrior had a turret based on that of the US LAV-25, equipped with a stabilised 25-mm M242 Bushmaster automatic cannon and dual TOW ATGMs.

Desert Warrior

Additional air conditioning and a different driver’s hatch/periscope also differentiate it from British Army vehicles.

The Arctic Warrior featured a high-capacity diesel heater, although extensive testing was carried out, the modifications remained as an optional extra.

Mortar

Designed with a large split rear hatch and a turntable for the in-service 81mm mortar.

A later proposal moved beyond a drawing and into a working version of the Royal Ordnance 120mm breach loading mortar called Thor

Warrior 120mm mortar

Turrets

Despite having a relatively small turret ring (in order to accommodate the 7th crew member), Warrior had all manner of turrets either proposed or built for demonstration.

One of the first, in 1984, was a Cockerill 90mm Mk3 turret, moved 25cm so that it was mounted on the vehicle centreline.

Warrior 90mm

The turret was also fitted with a 7.62mm coaxial machine gun and smoke dischargers.

A later 105mm version used an uprated Warrior 2000 and South African-developed turret with a stabilised main gun and coaxial 7.62mm GPMG. Both gunner and commander had stabilised day/night sights and fire control that enabled fire on the move. The combat weight was 29 tonnes.

Warrior 105mm

An earlier version of the same turret was also proposed with a 120mm GT12 main gun

The image below shows another Cockerill turret but this one with an Oerlikon KBB 25mm automatic cannon.

Warrior 25mm

With a 30mm Bushmaster automatic cannon and stabilised turret

Warrior Defence Reconnaissance Variant (DRV)

As part of its proposal for the FFLAV competition, GKN developed a smaller Warrior, like the 5-roadwheel APC described below. This would eventually be more widely known as Warrior Reconnaissance as it developed further although the correct term was Defence Reconnaissance Variant (DRV)

The first iteration featured a stabilised turret with an M-242 25mm Bushmaster cannon and twin TOW ATGW launchers. The vehicle carried 500 rounds of ammunition for the cannon and an additional four TOW missiles in the rear compartment.

A later version featured new radar-absorbent appliqué panels and was equipped with an elevating sensor mast with a multispectral surveillance system utilising radar, thermal imaging, day/night sights and a laser rangefinder/target designator.

The reduction in size and payload over a normal Warrior but retention of the same powerplant improved the power-to-weight ratio significantly. Additional communications equipment and an integrated sensor management system completed the specification.

Handling was apparently not brilliant but it was nonetheless an interesting development that echoes the much later ASCOD and CV90 proposals for FRES/SV.

VERDI-1 and VERDI-2

VERDI and VERDI-2 were two significant pieces of research work carried out by MVEE and the industry, and are important to the overall story.

In the late seventies, it was clear that vehicle microelectronics were going to play a major role in armoured combat vehicle development and so their integration with vehicles would require a new approach. MVEE established the Systematic Approach to Vehicle Electronics (SAVE) initiative that defined standards for electrical and electronic distribution, and physical characteristics.

The Modular Assembled Vehicle Installation System (MAVIS), or to you and me, a shelf, is also defined means by which electronics could be secured and mounted in vehicles.

In 1987, the Vehicle Electronics Research Defence Initiative (VERDI) built on this previous work. It examined how modern vetronics (a portmanteau of the words vehicle and electronics), sensors and communications equipment could be exploited to improve performance and reduce crew numbers. VERDI was a technology demonstrator using an FV510 Warrior as the base vehicle.

Concluding in 1990, VERDI demonstrated a number of different technologies including data bus multiplexers, navigation, data fusion, positioning, display and engine monitoring.

The benefits of mounting sensors on an elevating pneumatic mast from Clark Masts were also assessed. The demonstrator mast was equipped with a thermal imager and image intensifier. A crew of three was retained for this initial demonstrator but it was clear there was potential to reduce even this.

The Wide Area Surveillance Automated Detection (WASAD) project was built on earlier work at the Vehicles and Engineering Establishment (MVEE) which examined remote vision, vehicles with external cameras (instead of optical periscopes) and unmanned turrets. MVEE had concluded that the available technology of the period was not mature enough for adoption into service.

WASAD took another look, at newer technology. It developed a panoramic day/night vision system that included automatic target detection and recognition whilst on the move, connected via voice recognition to the fire control system on a modified Challenger 2.

WASAD had shown the potential of electronic systems integration in combat vehicles while highlighting the need for greater standardization to ease implementation.

VERDI and WASAD had demonstrated huge potential and this resulted in a second phase project starting in 1993, VERDI-2. It was also designed to de-risk some of the systems thought likely to be included with the new Tactical Reconnaissance Armoured Combat Equipment Requirement (TRACER).

The VERDI-2 Warrior was designed to test 2-man crew concepts and the ability to manoeuvre using only indirect vision. It had a side-by-side crew station, each with two CRT displays that could show mapping information, GPS data, symbology and other sensor information. VERDI-2 only had a crew of two, both side by side.

The sensor package was upgraded, using the automatic threat detection and identification systems from WASAD and this included audio warnings to the crew of potential danger.

The turret was also armed with an early version of the Starstreak High-Velocity Missile, Air Defence Alerting Device (ADAD) and a mock-up of the CTAi 40mm cannon.

A new concept for VERDI-2 was to team the 2-man Warrior with a Troop Leader’s Stormer, communicating in real-time to establish a ‘recce team’. This vehicle acted as a communications and data hub and was equipped with additional data networking and processing equipment.

VERDI also demonstrated a remote surveillance remote-tracked vehicle called HARP that was carried as a demountable payload.

Trials were completed by Household Cavalry, their 1994/5 Journal describing the process, including this amusing comment on the fragility of early vehicle electronics:

The navigation systems fitted included a Global Positioning System, inertial navigation and a digital map, over which tactical overlays could be superimposed. The map showed your position all the time and gave you an 8-figure grid. A most useful piece of kit, it was impossible to get lost but of course, the system did fail on one occasion which meant we went around in a circle and ended up where we started facing the opposite direction which totally confused the boffins monitoring us.

One of the trial’s participants concluded;

The trial on Salisbury Plain was a success in as much as it proved a two-man crew can operate effectively for 48 hours in a closed-down environment, and it opened our eyes to what is available to the recce soldier of tomorrow. The main question to be answered before TRACER comes off the drawing board is what is the main role of recce? What does it need to do, collect information or destroy enemy light armour or both? Whatever the answers are, it must be smaller and faster. Let’s hope I’m still around to see it

The choice of Warrior for use as the base vehicle for the VERDI demonstrator seems to suggest an explicit recognition that CVR(T) did not have space or electrical generation capacity for modern sensors and computing equipment.

Anti-Tank

Of the 489 FV510 vehicles, 105 were intended to carry TRIGAT-MR in the man-portable role, these were later simply used to carry Milan teams, and Javelin when it replaced Milan.

To replace Swingfire-equipped FV438, Warrior anti-tank envisaged either a TRIGAT-LR or HOT missile.

First shown in 1982, the 4,000m range HOT missile version had 4 missiles mounted on the 1 man Euromissile Hot Compact Turret and another 14 stored in the hull. Reloading was carried out external to the hull.

Warrior HOT

The turret had a powered elevation of -18 to +23 degrees and could traverse 30 degrees left or right.

The TRIGAT-LR proposal used an elevating mast that allowed reloading under armour.

Warrior TRIGAT

The shorter-range TRIGAT-MR was also proposed by GKN, using a non-elevating turret.

Warrior TRIGAT

Neither of these TRIGAT concepts progressed beyond the model/drawing stage.

For operations in 1991, 10 Warrior section vehicles were converted to fire a Milan ATGW.

Warrior MILAN

These were reverted to section vehicles when Milan was withdrawn and replaced with Javelin.

Battlegroup Support and Armoured Personnel Carrier (APC)

The first APC variant proposed had the 2 man turret replaced with a simple cupola with a 7.62mm GPMG. It also had one less road wheel than the section vehicle.

Warrior APC

Another version retained the roadwheel

Warrior APC

This version was also armed with a one-man cupola mounted 7.62mm GPMG with additional space from the removal of the turret used for stowage.

The Battlegroup and Armoured Battlegroup Support Vehicle has been an ongoing and unfulfilled requirement, essentially, Warrior variants replacing FV432 variants.

Warrior ABSV

Various versions of this have been shown through the years, the latest with Soucy continuous rubber tracks.

Mine clearance blades and bridge launching mechanisms have also been fitted to this version.

There was also an engineer variant designed that mounted a Ranger anti-personnel mine dispenser on the roof and could tow a barmine plough.

A command post demonstration also saw this fitted with a GIAT FINDERS (Fast Information, Navigation, DEcision and Reporting System) battle management system, BOWMAN radios, and a number of computer systems.

Low Profile and Lightweight

One of the more unusual and lesser-known variants, GKN produced a lightweight Warrior that was designed for carriage by C-130 Hercules. GKN proved this during US trials when it was flown back to the UK.

The designation for this version was LOVATT and it was marketed as part of GKN’s response to the British Army’s Future Lightweight Armoured Vehicles (FLAV) requirement in the late eighties.

Air Defence

The Low Profile variant was also used to demonstrate an ADATS fit

Although only in the concept stage, Warrior was also proposed as a Rapier missile carrier.

Warrior 2000

Warrior 2000 was developed as a private venture in response to a Swiss Army requirement (that would eventually be won by CV90)

Warrior 2000 was of all aluminium construction and had a range of improvements including better protection, a digital fire control system, an all-round camera system, a more powerful engine, a hydraulic engine deck lift, double pin tracks, reduced thermal and acoustic signature and an electric drive fully stabilised turret fitted with an ATK Bushmaster 30mm automatic cannon.

The hull was slightly longer (230mm) with inward-sloping sides and smoother upper surfaces to reduce the radar signature.

Combat weight was 31 tonnes and it had a range of 500km with a top road speed of 75kph.

A later version was also shown fitted with the same turret as the CV90-30

Warrior – Operations And Upgrades

As Warrior came into service during the late eighties and early nineties, it would site astride not only the collapse of the Soviet Union but also a significant deployment in the Middle East.

At the end of the eighties, the British Army had in service three distinct families of non-Main Battle Tank armoured vehicles which were, in age order:

  • FV432 – in service 1963
  • CVR(T) – in service 1972
  • Warrior – in service 1986

In addition, there were a number of specialist vehicles like the FV180 Combat Engineer Tractor (in service since 1976). And let’s not forget the Saxon. CVR(T) was getting on in years and thoughts had now turned to its replacement. FV432 was even older but had never been completely replaced by Warrior, as originally intended.

For all intents and purposes, the British Army was still very much configured to counter an invasion of Western Europe from the Warsaw Pact nations.

The end of the Cold War arguably started with the 1985 death of Konstantin Chernenko and the appointment of Mikhail Gorbachev as the General Secretary of the Soviet Union Communist Party.

What followed was a cascade of agreements, revolutions, recognition of nation-states and the smashing of concrete walls. Advances in vehicle electronics, communications technology, sensors and computing equipment would all be harnessed for military vehicles, despite the technology drivers being largely civilian in origin.

The microelectronics revolution was moving into gear.

The first SMS text message would not be sent until 1992 but the background work was well underway. First-generation analogue mobile networks were in limited service based on the iconic Motorola DynaTAC cell phone, while the much more advanced 2G digital mobile telephone networks were already in development.

Desktop computers had gone from the ZX81 in the early eighties to IBM PC Clones, which were widely adopted. The World Wide Web had been invented, the first web search for porn had taken place, and Photoshop was at Version 1.

The next ten years would see even more rapid change and military equipment would benefit just as much as plumbers, stockbrokers and spotty-faced teenagers.

The fall of the Berlin Wall and the dawning of the end of the Cold War resulted in Options for Change, the title of the 1990 Defence Review, the first carried out since the 1981 Nott Review.

In the House of Commons on 25th July 1990 Tom King MP, the then Secretary of State for Defence, said…

In the options for change studies, we have sought to devise a structure for our regular forces appropriate to the new security situation and meeting our essential peacetime operational needs. Our proposals will bring savings and a reduction in the share of GDP taken by defence.

Options for Change precipitated a reduction in armed forces personnel by just under 20%, the formation of ‘British Forces Germany’ (following the disbandment of ‘British Forces of the Rhine’ and a reduction of the personnel deployed to Germany) and a whole host of other amalgamations and changes.

The Army suffered the greatest reduction in manpower, going from 160,000 to 120,000 personnel.

Whilst this was happening, Cold War ‘heavy metal’ was arguably to have one last hurrah in the desert.

Operation GRANBY – Gulf War

In response to the Iraqi invasion of Kuwait in August 1990, a coalition was formed that would see 35,000 British personnel deployed as part of Operation GRANBY.

All six Warrior variants were deployed

4th Armoured Brigade, 7th Armoured Brigade and HQ 1st (UK) Armoured Division, and 5,000 vehicles were all shipped to Saudi Arabia in time for the 1991 kickoff.

The 7th Armoured Brigade consisted of the Royal Scots Dragoon Guards and Queen’s Royal Irish Hussars in Challenger I, with 1 Stafford in Warrior. 4th Armoured Brigade was infantry heavy with 1st Battalion Royal Scots and 3rd Battalion Royal Regiment of Fusiliers in Warrior, with 14th/20th King’s Hussars in their Challengers.

These two brigades would be reinforced by personnel from the Grenadier Guards. Over 250 Warriors of all variants were deployed to the Middle East.

The FV432, Warrior and CVR(T) all saw action, as did the Ferret and many others. Operation GRANBY also resulted in changes to the peacetime establishments. Instead of using FV432s for mortar fire controllers and Milan teams, additional Warriors were provided instead. This was a clear recognition that FV432 was now well behind the curve.

An appliqué armour package designed and built by Vickers Defence was fitted to the Warrior vehicles, in theatre, to provide greater protection.

The utility of this additional protection was proven when a Warrior Infantry Command Vehicle was hit by a 120mm HESH round fired by a Challenger I of the Scots Dragoon Guards. It resulted in much less damage than one might reasonably expect, and no deaths, although there were some very serious injuries.

A number of Warriors were modified with a turret-mounted Milan firing post. Although it could not be used on the move it did provide much greater mobility and protection for Milan than the FV432s would have.

Many other minor upgrades and modifications were completed in the buildup, maintenance-free batteries and satellite navigation systems for example. Even extra air conditioning systems were designed and tested but none were ordered due to the quick end of the conflict.

This operational replacement of some FV432/CVR(T) with Warriors enabled other organisational changes that differed from the peacetime norm. Instead of mixing armour and armoured infantry they were now organised independently and were only combined on a mission-specific basis.

By January 1991, 1 (UK) Armoured Division was declared operational after much preparation, training and reorganisation.

After 100 hours of fighting, it was all over.

GKN and the MoD specified reliability as a crucial criterion during the development of Warrior and this approach would be absolutely vindicated.

The Warrior fleet achieved a 95% availability during Operation GRANBY, incredible.

The Balkans

The British Army’s legacy fleet of CVR(T), FV432 and Warrior had seen service in the Gulf War and whilst that conflict proved their enduring value, it also highlighted their shortcomings.

Despite various plans to replace them, they were to have another outing, in the Balkans.

The first deployment was in 1992 as a result of UN Resolution 743, the so-called Vance Owen Plan. 743 called for the creation of buffer zones between Serb and Croat forces in Bosnia and Croatia, the zones to be monitored by UNPROFOR. UK forces were deployed under Operation GRAPPLE. Escorting UNHCR aid convoys started in 1993.

Because BRITFOR was armoured and had a certain reputation, success with aid convoys was better than many other nations, The combination of the imposing presence and protection of Warrior and the agility and mobility of CVR(T) combined to form an effective capability.

Towards the closing period of UNPROFOR operations, the difference between public opinion and on-the-ground reality was marked. Despite evidence to the contrary, there was a nearly-universal perception of Serbs as bad guys and Bosnian Muslims as victims. The peacekeepers were often placed in impossible situations because of the restrictions placed upon them.

In 1995, AST Group were awarded a £1m contract from the MoD to strip and repaint 200 Warrior vehicles as part of a wider corrosion control programme.

The mortar attacks on the Markale market in Sarajevo, the massacre at Srebrenica, the taking of UNPROFOR hostages and the general political environment would prove to be decisive factors in the move to the next stage of, IFOR. Following the Dayton Accords, it was NATO, not the UN that would be responsible for the implementation of the agreement and so IFOR was constituted, the Implementation Force.

Off came the white paint.

In 1998, conflict returned to the Balkans, specifically the Serbian region of Kosovo, a region not included in the Dayton Accords.

Repression and violence soon followed.

British Forces deployed again, and Warrior went with them

Iraq and Afghanistan

In 2001, after a competition between Avimo, Hunting Engineering and Thales, a £230m contract was awarded to Thales for the Battle Group Thermal Imaging (BGTI) programme for thermal imaging sighting systems on 455 Warrior and 146 Scimitar.

The contract was split into two groups, Group 1 and Group 2.

  • Group 1 was for Scimitar and Warrior Section and Command IFVs, both thermal imaging and navigation. 350 were fitted to Warrior and 146 to Scimitar.
  • Group 2, was for 100 Warrior Repair and Recovery variants and excluded the navigation elements

One of the key requirements for BGTI was integration with BOWMAN and the ability to hand off target information to Challenger 2. The legacy fleet was having to be maintained beyond its intended point because of the failure of two attempts to replace it.

In March, after a build-up period, CVR(T), FV432 and Warrior went to war, again, with 1(UK) Armoured Division.

In 2005, Thales completed deliveries of the last 250 Battlegroup Thermal Imaging (BGTI) systems for Warrior in January. The total contract value was £210 million which also included 15 years of support.

As the security situation worsened and the threat from IEDs, especially the explosively formed type, additional protection was added in the form of the WRAP2 kits.

Task Force Helmand was reinforced with Warriors and armoured infantry in September 2007, by 2009 the toll of Afghanistan was showing and a range of improvement packages were implemented, culminating in the TES(H) upgrade programme that was delivered in 2011.

C17 at Brize Norton is loaded with Warrior TES(H)_1. BEEFED UP WARRIOR SAVES LIVES UPON AFGHAN ARRIVAL Newly upgraded warrior vehicles have saved the lives of British soldiers within weeks of arriving in Afghanistan. Warrior is the only tracked infantry vehicle in theatre and so can get to places that wheeled vehicles cannot, enabling the infantry to engage the enemy more effectively in difficult terrain. Just a short time after receiving their modified Warrior Infantry Fighting Vehicles, troops from the Mercian regiment on patrol in the Durai East region of Afghanistan’s Helmand Province survived a serious IED blast thanks to the vehicle’s improved protection.

The Warrior deployment was reported to have delivered a significant tactical advantage. The various upgrades fitted to Warrior to enable service in Afghanistan increased its weight to just under 40 tonnes and the impact on mobility and reliability was significant.

A refresh upgrade programme for 70 vehicles was initiated, designed to restore mobility, improve reliability and implement a number of improvements in various other areas.

The £30m contract was awarded to BAE to bring vehicles up to ‘Theatre Entry Standard (Herrick)’, or TES(H)

The resultant vehicle still weighed just under 40 tonnes but the new suspension, brakes, air conditioning and other improvements restored mobility and reliability. Additional protection included improved seating for crew and passengers, transparent armour for the turret and a newly designed armour package.

Vehicles upgraded to TESH(H) totalled 70 across the major variants; FV511 Infantry Section Vehicle, FV512 Infantry Command Vehicle, FV513 Mechanised Recovery (Repair) Vehicle, FV514 Mechanised Artillery Observation Vehicle and FV515 Battery Command Vehicle, the latter converted to armoured ambulances.

TES(H) updates included;

  • A flexible modular armour system that can be adapted to meet changing threats and reduce vehicle weight
  • Enhanced seating design and cushioning to further improve mine protection and comfort
  • An improved driver vision system with an increase from one to three periscopes, providing a wider field of vision and a night-vision capability
  • Increased low-speed mobility and climbing performance, enabling the vehicle to tackle tough terrain and get closer to a target or destination
  • Motorsport-derived carbon fibre brakes provide significantly reduced stopping distance
  • Improved air conditioning for troop comfort in hot and harsh environments
  • Wire cutters protect the driver, commander and equipment on the vehicle from obstacles.

The roll-call of British sub-contractors on the programme included Allen Vanguard (Tewkesbury), Astrum, Renown (both Co Durham), Caterpillar Defence Products (Shrewsbury), Dana Spicer (Birmingham), GKN Driveline (Telford), Icon Plymer (Nottingham), MTL (Rotherham) Thales Optronics (Glasgow), Thyssen Krupp (Birmingham), Tinsley Bridge (Sheffield) and W A Lewis (Shrewsbury).

In many ways, Warriors in Afghanistan were deployed as ‘medium armour’ to dominate the ground, provide route security and in the infantry support role, acting as main battle tanks without the weight, arguably, the equivalent to FRES Direct Fire.

A new bridge that will provide a safe crossing over the Char Angir wadi, has been opened by the Mayor of Lashkar Gah this week. It has been constructed so that it will not be submerged by the flooding of the wadi, a seasonal occurrence which is part of the crop cycle for the Char Angir river basin.

It is also interesting to note the weight increase.

Warrior came into service as a 24-tonne vehicle and was now serving successfully in Afghanistan, having been continually upgraded over its lifetime, at 40 tonnes, over 60% heavier. Warrior was not selected on the basis of future weight increase potential but here we were, operating in a very hostile environment at a significant weight increase over the original specification.

NATO Forward Deployment

Warrior was deployed with British forces as part of the NATO Enhanced Forward Presence posture in central and eastern Europe.

The Bit Where I Ask A Favour

TD is a hobby for me

I strive to provide decent content for no cost but hosting, software and services add up.

You can help me keep the show on the road by…

Clicking an advert

Dropping a few quid in the Kofi jar

Or even buying some Think Defence merchandise over at Red Bubble

Thanks in advance folks, your support really is appreciated

Warrior Capability Sustainment Project

The Warrior Capability Sustainment Programme started in the early 2000s and was closely tied to the 40mm CTAS development programme.

One cannot view efforts to improve Warrior without understanding the 40mm CTA system. Recognising the approaching obsolescence of the 30mm RARDEN cannon, the MoD started a series of trade studies in order to develop the concept for a medium calibre weapon to replace it, one suitable to deal with emerging Russian combat vehicles.

These trade studies prompted GIAT and Royal Ordnance to explore options for a collaborative development programme. Consequently, a Royal Ordnance and GIAT 45mm Cased Telescoped Weapon System (CTWS) demonstrator was completed in 1991 with the prototype the following year.

This demonstrator had some input from the ARES 45mm weapon that had been in development in the USA. Differences from the older US system included a change from metallic to plastic for the ammunition case and the use of an electrical drive rather than being gas-operated.

The CTWS was intended for TRACER, a mid-life Warrior upgrade and the French VAD. In 1994, the joint development concept was formalised by the creation of a 50/50 Joint Venture between GIAT and Royal Ordnance called Cased Telescoped Ammunition International or CTAI for short.

In 1997 the decision was made to move the calibre to 40mm and rename it the CT2000 (rather optimistically, as it would turn out to be).

The Warrior upgrade programme started in 2001.

The Objective Future Cannon Programme (OFCP) was initiated in 2002, a joint programme between the UK MoD and French DGA. This defined the future programme activities and a number of key user requirements and specifications;

  • Rate of Fire 200 Shots per minute
  • Fire two ammunition types selectable <3s
  • Remote operation Low integration volume <80 litres total swept volume
  • Dispersion > <0,35 mil APFSDS > <1 mil GPR
  • Minimum Fatigue Safety Life 10,000 rounds
  • Operates in safety –46°C to +63°C
  • Satisfies prevailing UK MoD and French DGA safety standards STANAG 4439 insensitive
  • Reliability >98%
  • Supports ‘coincidence’ fire control solution

The first firing demonstration of the CTAS on a Warrior was in January 2002, in the ‘Xena’ turret, shown below.

Although not specifically aimed at any one vehicle the Manned Turret Integration Programme (MTIP) was a technology demonstrator working on the integration of the 40mm CTWS and a number of different sensors. A demonstration contract was placed with Cased Telescoped Ammunition International (CTAI) to complete risk reduction demonstrations on a manned turret, feed systems and other sub-systems.

CTA was required to demonstrate the CTWS in a manned turret fitted to a Warrior by the end of 2006. The French Délégation Général pour l’Armement (DGA) also placed a contract with CTA for an unmanned turret called TOUTATIS, again, to be trialled on Warrior.

In 2003, CTAI demonstrated early models of both turrets on Warrior, the manned turret providing Level IV protection at a weight of 3.8 tonnes and the unmanned turret providing Level III protection but at a much lower weight of 1.5 tonnes.

The unmanned turret also had all the ammunition within the turret and a simpler feed mechanism, carrying capacity was 68 rounds, compared to 42 for the manned turret.

Additional firing trials were carried out in 2004 at Ridsdale Ranges with the MTIP turret.

In recognition of the need to maintain Warrior capability, the MoD embarked upon the Warrior Lethality Improvement Programme (WLIP) in May 2005.

The initial plan envisaged an upgrade to 449 IFVs and the conversion of 125 vehicles into the Armoured Battlegroup Support Vehicle (ABSV), essentially, a de-turreted IFV used for certain FV432 roles like mortar carrier and ambulance.

The original intent was that the 40mm CTAS would be central to the Warrior Fightability and Lethality Improvement Programme (WFLIP) but in 2005, the MoD announced a competition, despite the significant investment in the CTAS since the early nineties.

The competition originally specified a minimum calibre of 35mm but this was subsequently changed to 30mm to allow other guns to compete.

Competing bidders included General Dynamics with a version of their Mk46 turret, as fitted to the proposed USMC Expeditionary Fighting Vehicle and now used in naval applications, Selex offered a Mk 44 Bushmaster in the Oto Melara HITFIST turret, Lockheed Martin/Rheinmetall, a modification of the existing Warrior turret and CTAI/BAE, the 40mm CTAS in MTIP-2.

France and the UK agreed on a common certification process for the 40mm CTWS in March 2006.

In April 2008, the MoD announced that the CTA International 40mm CTWS had been selected for both the Warrior and FRES Scout and at the June Eurosatory, show BAE showed their self-funded MTIP 2 turret on a Warrior chassis.

The MTIP 2 turret was a brand new design with a fully stabilised 40mm CTWS and applique armour package that provided the same protection level as the hull.

In November 2009, Lockheed Martin and the MoD’s Defence Support Group signed a partnering agreement in support of their Warrior Capability Sustainment Programme (WCSP) and Future Rapid Effect System (FRES) bids. Lockheed Martin and BAE submitted their bids for the Warrior Capability Sustainment Project in November.

After Lockheed Martin had been awarded a study contract to investigate a common Warrior/FRES turret, it became clear that there would, in fact, need two turret variants, one for Warrior, and the other optimised for the reconnaissance role for Scout.

Lockheed Martin proposed an upgrade of the existing Warrior turret and BAE, their advanced MTIP 2 design on which they had been working for some time. BAE was certain that an upgraded Warrior turret was not a sensible option and would be difficult to meet the MoD’s requirements with it in any case.

BAE released another video extolling the virtues of MTIP-2 and being the OEM for both vehicle and 40mm CTAS

BAE announced their investment of £4.5 million in a Turret Test Rig for both Warrior and FRES programmes in February 2010.

The £4.5m Turret Test Rig (TTR) will mimic the field testing of turrets for Future Rapid Effect System (FRES) Scout and Warrior vehicles by subjecting them to tests under extremes of temperatures. The tests are expected to take a turret through a 20-year lifespan in 12-18 months.

The facility is closely modelled on BAE Systems’ Mission Equipment Vibration Table (MEVT) in Minneapolis, built for the US FCS programme. Until now this was unique. The vibration created by tracked vehicles makes attaining good reliability very challenging, particularly for electronic components. Testing in the field, while necessary, is time-consuming, expensive and inefficient. Systems modelling and analysis manager Vince Whelan has relocated from Minneapolis where he worked on the MEVT to commission and use the new facility. He explains:

“The TTR will replace a large proportion of field trials with testing under tightly-controlled conditions. We will be able to begin these trials much earlier in the development process so that field trials become a matter of verification rather than investigation. We will also be able to test and iron out any snags in suppliers’ equipment earlier. “Having the TTR where the design team is based will help us pinpoint – and therefore solve – the source of any problems much more quickly and easily, so that we and the MoD can have confidence in meeting their demanding reliability targets.”

The rig was ordered four months ago and the facility is expected to be commissioned in September this year and will sit alongside the Systems Integration Facility which is already being heavily used for work on FRES and Warrior upgrade.

Further development and qualification of the 40mm CTA weapon were agreed upon by France and the UK in February.

In March 2010, it was announced that General Dynamics had been selected for FRES SV Recce Block 1, or more specifically, selected as the preferred bidder. In late March 2010, the MoD Investment Approvals Board recommended a year-long delay to WCSP.

WCSP was designed to extend the service life of Warrior beyond 2040 by which time it would have been in service for over 50 years.

The upgrade includes a new turret and 40mm CTA weapon, Warrior Enhanced Electronic Architecture and Warrior Modular Protection System. The demonstration phase, at a cost of £200m, would upgrade eight section vehicles and three other variants ready for trials between 2013 and 2014.

A production phase would follow that would upgrade 380 infantry fighting vehicles and other variants.

Each Multi Role Brigade was to have 1 Battalion equipped with Warriors.

The demonstration phase was expected to cost £200 million and manufacture £642 million. WCSP was designed to extend the service life of Warrior beyond 2040.

At this point, Lockheed Martin was still insisting an upgraded Warrior turret would be used for the WCSP vehicles.

In 2011, BAE was deselected from the Warrior Capability Sustainment Programme (WCSP) February which left Lockheed Martin as the only horse in a one-horse race, despite this they had not yet been awarded preferred bidder status.

BAE also displayed a Warrior Multi-Role Platform that it claimed could make use of the approximately 300 Warrior hulls not earmarked for upgrading as part of WCSP.

By 2012, the Warrior Capability Sustainment Programme now had an estimated full operational capability date of 2020 with production starting in 2018. The original aspiration of upgrading 643 vehicles had by now slipped to less than 400.

The £1 Billion programme cost included £358 worth of government-issued equipment such as the 40mm CTA with the balance going to Lockheed Martin. The cost per vehicle for Warrior CSP was therefore projected to be in the order of £2.6m.

In the summer of 2013 a number of Warrior announcements were made;

Procurement of Cased Telescoped Cannons (CTC) Ammunition

The Specialist Vehicle Cannon Project Team, part of the UK Ministry of Defence, intends to place a further buy of ammunition, with CTA International through an Amendment to Contract No FRES/0075, to support the demonstration phases of the Cased Telescopic Cannon which will be provided to Prime Contractors for integration into the Scout Specialist Vehicle (SV) and the Warrior Capability Sustainment Programme (WCSP). The total final value of contract(s); Value: 25 629 034 EUR Including VAT. VAT rate (%) 20

After a series of successful design reviews and 40mm CTA qualification in early 2014, the WCSP achieved Initial Design Approval in January 2014. Qualification firings included the APFSDS-T and practice rounds.

In parallel with Specialist Vehicles, the Warrior Capability Sustainment Programme also progressed.

The Capability Sustainment Programme has 4 main components that are planned to see Warrior out to 2040;

  • WFLIP (Warrior Fightability Lethality Improvement Programme)
  • WMPS (Warrior Modular Protection System)
  • WEEA (Warrior Enhanced Electronic Architecture)
  • ABSV (Armoured Battlefield Support Vehicle)

The Warrior Capability Sustainment Programme was also shown off in the middle of 2013, after completing the initial design review. The first Battlegroup was set to be available by 2018 with Full Operational Capability by 2020.

BAE developed an advanced hull concept with higher blast and ballistic protection, a new MTU/Renk pack, and GVA compliant electronic system.

The Warrior Capability Sustainment Programme (WCSP) completed its Preliminary Design Review in January 2014 following the System Design Review several months earlier.

News emerged in 2014 that confirmed a decision by Lockheed Martin to abandon the Warrior turret conversion and proceed with a new turret design, this was no doubt cold comfort to BAE, who had insisted from the start that a new turret would be needed.

The whole programme was ‘re-baselined’. Lockheed Martin completed live firing trials for the Warrior CSP with its new turret design.

AMPTHILL, BEDFORDSHIRE, 20 April 2015 – The British Army’s Warrior armoured vehicle has demonstrated its firepower and fighting capability during successful firing trials in Scotland. Pictures and video released today by Lockheed Martin UK show the Warrior vehicle’s new turret and cannon successfully firing against targets while on the move. These are the latest trials that Lockheed Martin UK are undertaking as part of the Warrior Capability Sustainment Programme to upgrade the Army’s fleet of 380 Warrior vehicles. Senior members of the Army and potential international customers were invited to the Ministry of Defence’s ranges in Kirkudbright to see the Warrior in action and get an update on the progression of the programme. Modified, designed and installed by engineers at Lockheed Martin UK’s Ampthill site in Bedfordshire, the infrastructure of the Warrior vehicle will be significantly improved, including fitting the new turret with the ultra-modern CT40 weapon system, an updated environmental control system to improve crew comfort, better all-round awareness cameras and driver’s night vision, along with a modular protection fitting system to the chassis to enable quick change of armour for specific threats

A video was released to coincide with this announcement

In 2015, the MoD finally placed a production order for the CTWS, although there was an announcement in 2015 for a £75m order. The deal with the joint BAE/NEXTER company CTA International was for £150m and will provide 515 weapons for the SV Scout and Warrior vehicles. The contract also included initial spares, test equipment, specialist tools and some training.

There will be 245 for the Scout and 245 for Warrior, the balance being used for training, trials and ammunition qualification. The MoD issued a contract amendment to CTAI for further qualification of the Target Practice Reduced Range round;

Amendment to contract MATT/CCAP/003 with CTA International (CTAI) to provide services required to conduct the qualification of a Target Practice Reduced Range (TPRR) type of ammunition on behalf of the United Kingdom and French Authorities.

The cost of this was 16.5 million Euros.

At DSEI in September 2015, a number of key announcements were made and the first Warrior CSP prototype was revealed.

The plan for Warrior remained to complete the order for 245 turreted Warriors out of a total order of 380. The 245 turreted versions would be split between FV510 Infantry Section Vehicle and FV511 Infantry Command Vehicle.

Whilst the FV512 Mechanised Combat Repair Vehicle and FV513 Mechanised Recovery Vehicle (Repair) would likely be the majority of the non-turreted versions, the number of FV514 Mechanised Artillery Observation Vehicle and FV515 Battery Command Vehicle variants covered by WCSP was not published.

Given many FV515s were converted to ambulance variants for operations in Afghanistan and the possibility of some Ajax taking the role of the artillery observation roles, the final numbers were uncertain.

In March 2016, the first production CTA systems were handed over:

The first production-standard Cased Telescoped Cannon System has been handed over to the UK Ministry of Defence (MOD) in Bourges, France by CTA International (CTAI) – a 50/50 joint venture company between BAE Systems and Nexter Systems

At the Paris Air Show in 2017, a number of news outlets reported on a series of tense conversations between the MoD and Lockheed Martin, for example;

One of the less well-reported discussions at the Paris Air Show last week apparently took place between Tony Douglas, the Chief Executive of Defence Equipment & Support, and Marilyn Hewson, President and CEO of Lockheed Martin. Central to the discussion was the issue of continuing delays to the WARRIOR Capability Sustainment Programme (WCSP).

Lockheed Martin was contracted in 2011 to upgrade and enhance the UK’s fleet of over 600 WARRIOR Infantry Fighting Vehicles, extending their service lives into the 2040s. The company won the contract, valued at £1 billion (of which fully two-thirds is likely to be booked by Lockheed Martin itself) after the MoD eliminated BAE Systems from the running.

Six years later none of the required 12 demonstrators with replacement turrets and weapon systems has been delivered and the company is said by observers close to the programme to be struggling with cost and complexity.

The timing could not be worse for either party, as the government initiates a 60-day spending review in the wake of a Brexit-inspired devaluation of almost 15% in the pound. The National Audit Office has issued a stark warning regarding unprecedented levels of risk in the MoD’s equipment plan, adding that the current £10+ billion contingency fund could be entirely swallowed up.

The original plan called for the upgraded WARRIORs to enter service next year, which is now clearly impossible. Although any programme as complex as this must involve the risk of schedule slippage, the extent of the delays is apparently causing concerns over the 500+ AJAX order, for which Lockheed Martin also builds the turrets.

Clearly, all was not well in the Warrior CSP camp but the following month, a rather interesting counter from Lockheed Martin:

Meanwhile, the first upgraded Warrior vehicles have now entered Factory Acceptance Tests with full qualification trials expected to begin in Bovington by the end of the year. As well as manufacturing the new turret for WCSP, LMUK is also responsible for putting together the upgrade ‘kits’ that will refresh the vehicle’s protection as well as the platform’s electronic architecture.  For the development trials, there will be seven FV520s (section vehicle); two FV521s (command vehicles); one FV522 (repair); one FV523 (recovery); and one FV524 (artillery observation vehicle) to come in the future.

Lockheed Martin showcased Warrior CSP at DSEI in 2017.

Not connected to CSP, Soucy completed a trials programme with Warrior and continuous rubber tracks in 2017.

The results were reportedly, excellent.

The MoD rebaselined the Warrior CSP programme in 2017

In 2018, after a great deal of speculation, the MoD confirmed Warrior CSP was delayed by 13 months, with a new ISD of 2023 and cost growth of £200m. Lockheed Martin and 30 of its industry partners showcased Warrior CSP at the Tank Museum in March 2019 after live firing trials had been completed the month before.

Reliability Growth Trials were to commence the month after. In the same month, it was reported that Warrior CSP was now three and a half years late and £227m over budget.

Lockheed Martin released a video in 2019 describing the programme’s progress and status.

Lockheed Martin and the Armoured Trials and Development Unit (ATDU) progressed with the development of WCSP but speculation was growing in 2019 that the programme was experiencing more difficulties., the major projects report stated the problems.

A written Answer provided a cost breakdown by year for Warrior CSP from 2012 to 2019

FY2012-13FY2013-14FY2014-15FY2015-16FY2016-17FY2017-18FY2018-19
£40,211,600£62,804,000£95,671,000£57,464,700£69,444,300£61,155,900£45,192,700

The Times speculated that in 2019, the MoD was considering creating new hull structures rather than upgrading the existing ones.

There was some speculation that hull cracking and delamination were raising the programme risk.

In November 2020, further news on contract progress;

The Warrior Capability Sustainment Project is currently in the Demonstration Phase. The Invitation to Negotiate (ITN) for the WCSP Manufacture Phase was released to Lockheed Martin UK (LMUK) in June 2020 with continued dialogue between the parties. LMUK’s formal response to the ITN is anticipated in December 2020. It would not be appropriate to comment further on this ongoing commercial activity.

Despite the issues in the public, ATDU and Lockheed Martin accelerated progress in the trials programme, by the end of 2020 completing 21,000km of driving and firing over 5,000 rounds of 40mm ammunition.

75% of the reliability growth trials were complete by the end of 2020. In early 2021, decisions on Challenger and Warrior upgrade programmes were delayed so they could be considered as part of the Integrated Review.

Despite this late progress, Warrior CSP was cancelled in the 2021 Integrated Review and subsequent command paper.

We will no longer upgrade Warrior but it will remain in service until replaced by Boxer, which we expect to happen by the middle of this decade

Following the cancellation of Warrior CSP, Lockheed Martin announced 158 job losses at its Ampthill site in April 2021.

The final cost to the MoD…

The cost of the Warrior Capability Sustainment Programme to 31 March 2021 is £594.6 million (inc VAT). This figure is potentially subject to change due to ongoing commercial negotiations following the Integrated Review announcement.

Some of the development vehicles have been handed over to the Armour Museum

Post WCSP Cancellation

In response to a fatal accident, the MoD confirmed in 2023 that Warrior was being fitted with driver awareness cameras and a number of sources reported that 30mm Rarden ammunition manufacturing was being restarted.

Warrior continued to be used in various training exercises.

Summary

Warrior has been a solid, reliable and capable vehicle for the British Army for near on four decades.

Yet it is hard to see it as anything but emblematic of the British Army’s historically abysmal approach to industrial and capability husbandry through continuous incremental improvements (or spirals in the modern vernacular).

The MoD and British Army squandered the potential of Warrior, no one else

More recently, it is important to note that the Capability Sustainment Programme (CSP) was not just a new turret; new electronics and electrical systems, environment and protection are all dramatically improved. The 40mm CTAS would have provided a huge lethality uplift over the 30mm RARDEN and the latest sensors, fire control systems and stabilisation systems would allow accurate firing on the move.

It wasn’t your grandfather’s Warrior, to coin a phrase.

The CSP programme had been far from smooth despite solid progress towards completing the Assessment Phase.

However close to delivering a solid and workable vehicle it was, and it was within a hair’s breadth, perhaps the time was just too short for Warrior.

A cynic might observe that all defence reviews must have a cancellation, for the Army, at that time, it was this or Ajax.

There was only ever going to be one winner in that fight.

Although the story of Warrior is not yet quite over, one would certainly hope those in charge of defence procurement have learned the lessons it so illustrated.

The final irony…

With CVR(T) gone and Ajax nowhere to be seen, Warrior is now being used as a recce vehicle

Acknowledgements

I would like to thank ‘Challenger 2’ from the Plain Military Forum and Artem Belikov for allowing me to use some of the images above, thanks, gents! Given Artem a follow @skylancer7441

Change Record

DATECHANGE
15/03/2020Initial issue
12/09/2020Additional VERDI-2 images
23/07/2021Update to CSP cancellation and format refresh
24/10/2022General update and refresh
04/08/2023Added details on legacy fleet activity

Subscribe
Notify of
guest
26 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments