June 8, 2012. With the dock flooded, the 13,000 tonne superblock 03 floated for the first time. Next step is to float it out of the dock, float in the 6,000 tonne LB02 section that arrived from Portsmouth, before floating SB03 back in and moving ahead with the next stage of the assembly.